Practical OT Security No. 1
When the vendor finishes, what access remains?
For small and mid-size utilities and the integrators who support their OT systems.
Use this worksheet with operations, controls engineering, and security to review one vendor connection. Record how access is approved, what ends when work finishes, and which operational services depend on the connection.
Inside the worksheet
- Two worksheet pages and a two-page fictional water-utility example
- A 90-day comparison of vendor work hours and hours when access was available
- Questions covering approval, session termination, remaining authorization, operational dependencies, and safe validation
- Space to assign unresolved questions to an owner

How to use it
- Choose one vendor connection.
- Review it with operations, controls engineering, and security.
- Assign the unknowns and agree on the next action.
These worksheets are TANDMM’s interpretation of NSA’s October 2026 guidance, Hardening Department of War Critical Operational Technology Environments with Zero Trust Principles. Pages 10-11 address remote and third-party access. Pages 16-17 address safe validation. No NSA endorsement of these resources or any product is implied.
NEXT STEP · PRACTICAL OT SECURITY NO. 2
OT Disconnect and Reconnect Planning
Establish what depends on a connection, how staff will manage the disconnect control, and what must be checked before restoring access.
Questions about your environment? Contact TANDMM.